Equipment: Remanufacturing Checklist
PPI-DurEquip Supplier #2 Supplier #3
Is the pump or dispenser completely disassembled to allow the frame and other major components to be sand- or bead-blasted? Yes ? ?
Is the frame and the interior painted with rust inhibitor paint? Yes ? ?
Is all internal wiring brought to OEM specs? Yes ? ?
Are reset switches and springs always replaced with brand new parts? Yes ? ?
Are all O-rings, gaskets and seals replaced with new ones, including both fluid-handling items and trim items? Yes ? ?
Are mechanical computers always rebuilt, regardless of their apparent condition? Yes ? ?
Are meters always rebuilt, regardless of apparent condition? Yes ? ?
Are new filters installed? Yes ? ?
Are pulsers tested and rebuilt as necessary? Yes ? ?
Are all electronic boards tested and rebuilt as necessary? Yes ? ?
Are all plastic display windows replaced? Yes ? ?
Are all instructional and total sale decals replaced? Yes ? ?
Is the exterior metal and trim 100% new OEM quality material, fit, & finish or is it just "cleaned-up" used metal? Yes ? ?
Is the unit tested by actually pumping product? Yes ? ?
Are meter calibration ranges checked, ready for island setup? Yes ? ?
Does the supplier perform controlled high pressure fluid & air tests for leaks? Yes ? ?
Is the unit properly boxed and palletized for shipment? Yes ? ?
Is the Final Quality Control checklist shipped with each unit? Yes ? ?
Does the unit retain its NTEP (Weights & Measures) Certificate of Compliance? Yes ? ?
Is the product warranted realistically? Like OEM equipment? Yes ? ?
Mechanical parts warranted for: 1 Year ? ?
Electronics warranted for: 1 Year ? ?
Labor included in warranty for: 90 Days ? ?
Is the company strong enough to back its warranty? Yes! ? ?